Showing posts with label afghan. Show all posts
Showing posts with label afghan. Show all posts

14 May 2008

lizard ridge #6

lizard ridge 6just a quick little update. i finished the the 6th panel on the lizard ridge. i laid the 5 that were not drying from being blocked across my floor last night and decided that i may need the blanket to be 6 panels wide instead of 5.

that means i need to decide if i want to make it 5 tall by 6 wide... or go ahead and knit 36 instead of 30 panels. (i have already mentally upsized from the 24 panels called for in the pattern). i could also d a larger crochet border since, well... i like crocheting. =)

speaking of... i am now off to being the process of crocheting together a 180 panel afghan for a customer at the store. yes, i am being paid.

13 May 2008

lizard ridge #5

lizard ridge 5yesterday i decided to minimize my productivity. i have been working so hard for so long that i really needed a day off. yes, i know it was a monday. what's it to you, huh?

i did dig out my bedroom so i would no longer be swallowed by my "tech piles". and i knit. a lot. i finished the 5th block of my Lizard Ridge, and i am very close to completing the 6th block.

when i finish the 6th, i will go back to my unfinished projects, which as you may note from the side bar, are piling up on me. (piles! imagine that.) the christening shawl is the only one that has a deadline, but i have had a good reason to not work on it in the last 2 weeks... i'm not crazy enough to knit lace dog tired.

this block was knit in Noro Kureyon colorway number 182.

12 May 2008

lizard ridge #4

lizard ridgei have had very little time to knit or crochet with my hectic work schedule, but i recently spent several hours sitting at the MVA getting my title and plates changed on my car. i needed a project that i could easily keep track of in a noisy (potentially uncomfortable) room so i wouldn't go stir crazy.

ta-da.
my afghan squares!
this one was completed almost exclusively under unusual circumstances. sitting and standing in line at the MVA was one half. i did about 1/4 of it in complete darkness, and most of the last bit was done in the car, stuck in traffic (i moved 5 miles in nearly 3 hours, perfectly safe knitting "speeds"). i bound it off at home.

this is Noro Kureyon in colorway number 95. i loved it in the skein. i wish it had knit up with a little more variety. because i am doing 6 pattern repeats instead of five on my blocks, when i came to the end of my yarn all i had left was one color... so i cut it and finished off the last stripe with the remains of a prior ball.

i made a little mistake in the pattern on this block, and i did not notice until after i blocked the piece. boo. maybe i will be the only one who notices...?

i doubt it!